Hi {{first_name | there}},
Quick one this week, aimed at chapter leadership.
There is a document every one of your members sends, several times a month, that almost nobody has ever trained them on.
The proposal is the only sample of a builder's work that exists before the work exists. It arrives first, it gets compared against two competitors at a kitchen table, and the homeowner making that comparison cannot evaluate framing or tile. They can only evaluate the document.
Buildertrend's 2026 data has 22.1% of builders still estimating in spreadsheets and 31.5% not using takeoff software. That usually shows up as a wall of line items with no explanation, sent as a PDF with a filename nobody would open twice.
Why this is good chapter programming
It is specific, it is fixable in an afternoon, and it touches money directly. Most marketing advice asks a builder to become a marketer. This asks them to rewrite one document they already send.
A short session would cover three changes. Put real material costs in the proposal instead of allowances, since unexpected product and service costs are the single biggest driver of budget overruns. Show a good, better and best option on the two or three line items most likely to change, so the upgrade happens at the table instead of mid-project. And open with a paragraph describing how the job actually runs, who the homeowner hears from and how often.
There is a second angle worth raising too, which is speed. A bid that arrives in 48 hours reads as competence. One that arrives in two weeks reads as disinterest, and by then the homeowner has had two other conversations. Members who are slow to send bids are losing jobs they priced correctly, and most of them have never connected those two facts.
Formats that work
A 20-minute session at a regular meeting. A one-page member resource. Or a proposal swap, where three members bring a redacted bid and the group talks through what a homeowner would see first. That last one costs the chapter nothing and tends to produce the most honest conversation in the room.
The takeaway
Your members do not need a course on estimating. They need someone to point out that the estimate is a sales document, and that most of them are sending a spreadsheet.
I send Builder Playbook to more than 9,500 builders and remodelers each week. If you need assistance with your newsletter, let me know! I’d love to connect and see how I can get your Association on track. Just hit reply to setup a quick chat.
Timothy Dahl
[email protected]
Founder - Builder Playbook
Connect with me on LinkedIn
